Emergency response planning · tank farms, refineries, terminals

A real-time pre‑plan for every tank, every product, every weather condition.

Avertis models a fire, explosion or toxic release on your own site map using live wind and temperature data, calculates the foam, water, equipment and personnel to NFPA 20 and API RP 2001, and writes the result into your Emergency Response Plan. When the weather or the product changes, you re-run the plan instead of rewriting it.

Early access opens 16 Nov 2026 for selected operators. Built by Alert Disaster Control’s industrial emergency responders and IAMTech’s industrial software engineers.

TIP T-07 / SW · Tank 07 · Naphtha · 60 m ØExample site
Plan view of a tank farm with red, orange and yellow thermal radiation zones drawn downwind of a tank fire T-07 NSEW ≥ 12.5 kW/m² ≥ 5 kW/m² ≥ 1.6 kW/m² monitor position
≥ 12.5 kW/m²≥ 5 kW/m²≥ 1.6 kW/m²Fire monitor
Wind (live)225° SW · 6 m/s
Foam rateset by product
Weather refresh60 s
5–10 minFrom site layout to a first-draft plan with the set-up wizard, vs weeks for a consultant study
60 sDefault live-weather refresh into every model, vs one prevailing wind on a paper plan
NFPA 20 · API RP 2001Foam, fire-water and containment worked out in the plan, vs a calculator at the bund wall
305Products out of the box, fully editable, and you can add your own

Why pre-plans fail

Everybody knew what to do on paper.

We asked fire chiefs and firefighting-system engineers how pre-plans fail on the day. The same five problems came up every time.

Stale

One product, one wind

Tank contents can change week to week, and that changes the foam application rate. Coastal winds reverse between day and night. Most plans assume one product and one prevailing wind.

Volume

Ninety tanks, ninety plans, times eight winds

A refinery with 90+ tanks needs a pre-plan per tank, per wind direction, before hazmat and gas releases. Written by hand, many don’t exist. The ones that do are reviewed once a year and audited every 3–5 years, and the 3-inch binders aren’t with the firefighters.

Foam

Foam and water planned once, against assumed conditions

Quantities need updating at the scene as conditions change, not just planned in advance, so the foam and water don’t run out.

Kit

Once a 12-inch hose is down, it’s down

Charged 12-inch hose holds about 71 kg of water per metre. Laid on the wrong side of the bund, it can take an hour to move.

Standard

No enforced standard

NFPA 1660 is voluntary and doesn’t define what a pre-plan contains, so one refinery has a two-page plan and the next has none.

How it works

Site map to incident command in one system

01 · MAP

Put your site on the map

  • Esri and Google aerial layers
  • CAD drawing overlay (DXF / DWG)
  • Your tanks, products and equipment as icons you manage

Set-up wizard · 5–10 min

02 · MODEL

Model the event

  • Thermal radiation: tank, bund and unconfined spill fires, jet fire
  • Gaussian dispersion: continuous, instantaneous, bund evaporation
  • Overpressure: BST / TNO and TNT
  • Results table and burn-down time from tank inventory

Live weather · 60 s default

03 · PLAN

Write the plan

  • Foam, fire-water and containment calculated per scenario
  • Plan template based on recognised fire service practice and NFPA; AI drafts sections
  • Checked against COMAH, NFPA and IP19
  • PDF export with contents page

NFPA 20 · API RP 2001

04 · COMMAND

Run the incident

  • Command structure in line with NIMS and JESIP
  • METHANE messages and incident action plan
  • Task board with a full audit trail
  • Briefing templates; one dashboard for several incidents

Same data, plan to command

Compared to what you use today

Where Avertis sits

Paper or consultant planSpecialist modelling softwareAvertis Intelligence
Who runs itWritten once by a consultant; the site team sees the outputA trained modeller; hard to pick up again after months awaySite team, through the set-up wizard. Super users model; others view
WeatherOne prevailing windEntered by hand per runLive wind and temperature feed, refreshed every 60 s by default
Foam and waterCalculated by hand, if at allNot coveredCalculated to NFPA 20 / API RP 2001 inside the plan
Where the plan isA binder in the chief’s office or the control roomOn the modeller’s desktopThe same live plan for everyone responding, in a web browser
When the product changesReviewed once a year and audited every 3–5 years; the plan waits until thenNew studyChange the product and re-run the model and plan
During the incidentBinder in the control roomNot usedCommand structure, METHANE, task board and audit trail on the same data

Who it is for

What changes for each role

Fire chief · incident commander

Know where the kit goes before you lay it

The plan shows the wind, the hazard zones, where to set monitors and how much foam concentrate the tank needs. During the event, the same plan supports incident command, METHANE and JESIP messages and tasks, so everyone from the control room to the crew at the tank works from the same picture. Crews train against the same scenarios as desktop exercises, so you find out whether they can deliver the plan before a real fire does.

HSE manager

Plans that keep up with the site

When a tank changes product, re-run its plan instead of waiting for the next audit. Every plan is checked against COMAH, NFPA and IP19, and every action in an incident is logged with a time stamp for the review.

Site leadership and the board

Can you show you planned properly?

Accountability for a major incident now sits with the executive. If you are asked tomorrow whether you planned properly, and whether the community around you was protected, Avertis gives you the evidence: a current modelled plan for every tank, a time-stamped record of every decision, and the plume on the same map your neighbours recognise. A plan written once and shelved can’t show that.

Who built it

Industrial emergency responders and software engineers

1988

Alert Disaster Control

Oil-well firefighting, blowout control, hazmat response, and marine and industrial firefighting across Asia, Canada, the Middle East, Russia and the USA. ALERT’s responders built their on-the-ground experience into Avertis, and can build your plans with you.

1973

IAMTech

Working with the process industries since 1973, first as industrial model makers and now as a software company. Its software is used every day on operating sites, including iPermit2.0 for control of work and iPlanSTO for shutdown, turnaround and outage performance. IAMTech builds, hosts and supports Avertis from Middlesbrough, UK.

Show your neighbours the modelling

Model a release on the same aerial map your community recognises and see whether the plume reaches the school or the housing estate down the road, with the weather on the day rather than a worst-case guess.

Early access

Apply for early access

We are opening Avertis to a small group of selected operators first. Each site gets onboarding from IAMTech and ALERT, and its feedback goes straight into version 1.0.

  • NowApplications open
  • 16 Nov 2026Early access for selected operators
  • 31 Mar 2027Version 1.0 goes live

Prefer email? jonswift@iamtech.com

Questions

Before you apply

Do we need to install anything?

No. Avertis is cloud-hosted and runs in a web browser, so there is nothing to install on your site network.

Do we need a modelling specialist?

No. The set-up wizard takes a site from layout to a first-draft plan in about 5–10 minutes. Admin roles let a few super users build and change models while everyone else views the plans, so access, updates and a current model don’t depend on the fire chief who retired last year.

Which standards does it work to?

Foam, fire-water and containment are calculated to NFPA 20 and API RP 2001. Plans are checked against COMAH, NFPA and IP19. Incident command is in line with NIMS (US) and JESIP (UK), with METHANE messaging.

Can ALERT build the plans for us?

Yes. ALERT’s response teams can build and review your plans with you, and the experts on your team can work inside Avertis.

Can we train against the plans?

Yes. The same scenarios run as desktop exercises on your own site data, so crews can test whether they can deliver the plan. What they learn goes back into the plan, so it is better if the scenario ever becomes a real event.

What does early access cost?

Early access is free for selected operators. Pricing after the trial has not been set yet; we will confirm it before you commit to anything.

If you don’t plan, you’re going to fail.

You have the trucks, the foam and the people. Without a current plan, they can’t do their job. Keep every tank’s plan current before the next incident, not after it.

Emergency response planning · tank farms, refineries, terminals

A real-time pre‑plan for every tank, every product, every weather condition.

Avertis models a fire, explosion or toxic release on your own site map using live wind and temperature data, calculates the foam, water, equipment and personnel to NFPA 20 and API RP 2001, and writes the result into your Emergency Response Plan. When the weather or the product changes, you re-run the plan instead of rewriting it.

Early access opens 16 Nov 2026 for selected operators. Built by Alert Disaster Control’s industrial emergency responders and IAMTech’s industrial software engineers.

TIP T-07 / SW · Tank 07 · Naphtha · 60 m ØExample site
Plan view of a tank farm with red, orange and yellow thermal radiation zones drawn downwind of a tank fire T-07 NSEW ≥ 12.5 kW/m² ≥ 5 kW/m² ≥ 1.6 kW/m² monitor position
≥ 12.5 kW/m²≥ 5 kW/m²≥ 1.6 kW/m²Fire monitor
Wind (live)225° SW · 6 m/s
Foam rateset by product
Weather refresh60 s
5–10 minFrom site layout to a first-draft plan with the set-up wizard, vs weeks for a consultant study
60 sDefault live-weather refresh into every model, vs one prevailing wind on a paper plan
NFPA 20 · API RP 2001Foam, fire-water and containment worked out in the plan, vs a calculator at the bund wall
305Products out of the box, fully editable, and you can add your own

Why pre-plans fail

Everybody knew what to do on paper.

We asked fire chiefs and firefighting-system engineers how pre-plans fail on the day. The same five problems came up every time.

Stale

One product, one wind

Tank contents can change week to week, and that changes the foam application rate. Coastal winds reverse between day and night. Most plans assume one product and one prevailing wind.

Volume

Ninety tanks, ninety plans, times eight winds

A refinery with 90+ tanks needs a pre-plan per tank, per wind direction, before hazmat and gas releases. Written by hand, many don’t exist. The ones that do are reviewed once a year and audited every 3–5 years, and the 3-inch binders aren’t with the firefighters.

Foam

Foam and water planned once, against assumed conditions

Quantities need updating at the scene as conditions change, not just planned in advance, so the foam and water don’t run out.

Kit

Once a 12-inch hose is down, it’s down

Charged 12-inch hose holds about 71 kg of water per metre. Laid on the wrong side of the bund, it can take an hour to move.

Standard

No enforced standard

NFPA 1660 is voluntary and doesn’t define what a pre-plan contains, so one refinery has a two-page plan and the next has none.

Who it is for

What changes for each role

Fire chief · incident commander

Know where the kit goes before you lay it

The plan shows the wind, the hazard zones, where to set monitors and how much foam concentrate the tank needs. During the event, the same plan supports incident command, METHANE and JESIP messages and tasks, so everyone from the control room to the crew at the tank works from the same picture. Crews train against the same scenarios as desktop exercises, so you find out whether they can deliver the plan before a real fire does.

HSE manager

Plans that keep up with the site

When a tank changes product, re-run its plan instead of waiting for the next audit. Every plan is checked against COMAH, NFPA and IP19, and every action in an incident is logged with a time stamp for the review.

Site leadership and the board

Can you show you planned properly?

Accountability for a major incident now sits with the executive. If you are asked tomorrow whether you planned properly, and whether the community around you was protected, Avertis gives you the evidence: a current modelled plan for every tank, a time-stamped record of every decision, and the plume on the same map your neighbours recognise. A plan written once and shelved can’t show that.

Early access

Apply for early access

We are opening Avertis to a small group of selected operators first. Each site gets onboarding from IAMTech and ALERT, and its feedback goes straight into version 1.0.

  • NowApplications open
  • 16 Nov 2026Early access for selected operators
  • 31 Mar 2027Version 1.0 goes live

Prefer email? jonswift@iamtech.com

Questions

Before you apply

Do we need to install anything?

No. Avertis is cloud-hosted and runs in a web browser, so there is nothing to install on your site network.

Do we need a modelling specialist?

No. The set-up wizard takes a site from layout to a first-draft plan in about 5–10 minutes. Admin roles let a few super users build and change models while everyone else views the plans, so access, updates and a current model don’t depend on the fire chief who retired last year.

Which standards does it work to?

Foam, fire-water and containment are calculated to NFPA 20 and API RP 2001. Plans are checked against COMAH, NFPA and IP19. Incident command is in line with NIMS (US) and JESIP (UK), with METHANE messaging.

Can ALERT build the plans for us?

Yes. ALERT’s response teams can build and review your plans with you, and the experts on your team can work inside Avertis.

Can we train against the plans?

Yes. The same scenarios run as desktop exercises on your own site data, so crews can test whether they can deliver the plan. What they learn goes back into the plan, so it is better if the scenario ever becomes a real event.

What does early access cost?

Early access is free for selected operators. Pricing after the trial has not been set yet; we will confirm it before you commit to anything.

If you don’t plan, you’re going to fail.

You have the trucks, the foam and the people. Without a current plan, they can’t do their job. Keep every tank’s plan current before the next incident, not after it.